OSCA 2024 · 731938 · Skill level 4
Stone Processing Machine Operator: OSCA 731938
ABS OSCA 2024 v1.0 · visa lists checked 21 October 2026
Stone Processing Machine Operator is OSCA 2024 code 731938. It corresponds to ANZSCO 711114 Stone Processing Machine Operator, which is not on the skilled visa lists. Visa lists still use the ANZSCO code.
ANZSCO equivalent
ANZSCO code for OSCA 731938
Skilled visa lists still use ANZSCO codes, so this is the code that decides your visa options.
ANZSCO 711114
Stone Processing Machine Operator
Not on the skilled occupation lists.
The job
What a stone processing machine operator does
Operates machines to cut and finish stones for tiles, building blocks and facings.
Skill level 4: Certificate II or III, or at least 1 year of relevant experience
Specialisations
- Marble Cutter
- Stone Polisher
- Stone Sawyer
Main tasks
Main tasks
- Sets up and prepares machines for stone cutting and finishing
- Measures and marks stones according to specifications
- Loads and unloads stones into machines
- Operates and monitors machines to ensure stones are cut accurately and efficiently
- Inspects finished stones for quality and makes adjustments to machines as needed
- Uses hand tools to finish and polish stones
- Cleans and maintains machines to ensure proper functioning
Unit group 7319
Other occupations in Other Machine Operators
Questions
OSCA 731938: common questions
What is the OSCA code for stone processing machine operator?
What is the ANZSCO code for OSCA 731938?
Is Stone Processing Machine Operator on Australia's skilled occupation lists?
Does Home Affairs use OSCA codes for visas?
Talk to us
Not sure which code fits your experience?
Tell us your duties, qualifications and experience. We will confirm the right occupation and the visas that fit.
Source: Australian Bureau of Statistics, OSCA 2024 v1.0 (CC BY 4.0); Department of Home Affairs, checked 21 October 2026. General information only, not immigration advice.
Plan your move to Australia
A first consultation covers eligibility, realistic timelines, total cost and the tax consequences of the move. You leave with a written plan, not a brochure.


